Romet RM Imperial
Badged Capacity: 1000 38000 ft3/hr
Max Operating Pressure: 175 PSIG
Readout: Mechanical FT3 & M3
Connections: 1.5” NPT 6” ANSI 150 FL
Install: Inside or Outside
Lead time: Stock items
RM Imperial 1M 23M Bulletin
RM Metric G16 G400 Bulletin
RM Install Instructions |
Romet RM Medium & High Pressure
Badged Capacity: 2000 3000 ft3/hr
Max Operating Pressure: 275 600 PSIG
Readout: Mechanical FT3 & M3
Connections: 2” ANSI 300 / 600 FL
Install: Inside or Outside
Lead time: 6 weeks
RM MP & HP Bulletin
RM Install Instructions |
Romet RM Elec. Corrected (ECM2)
Badged Capacity: 1000 38000 ft3/hr
Max Operating Pressure: 175 PSIG
Readout: Elect. & Opt. Mech. FT3 & M3
Connections: 1.5” NPT 6” ANSI 150 FL
Install: Inside or Outside
Lead time: 4-6 weeks
RM ECM2 Bulletin
RM ECM2 w/ Mech. Index Bulletin
RM ECM2 Instructions |
|
|
|
|
Actaris (Schlumberger) Delta
Badged Capacity: 800 38000 ft3/hr
Max Op. Pressure: 175 1440 PSIG
Readout: Mechanical FT3 & M3
Connections: 1.5” NPT 6” ANSI 150 FL
Install: Inside or Outside
Lead time: 6-8 weeks
Delta 8C16M Imperial Bulletin
Delta G10G650 Metric Bulletin
Delta Install Instructions |
Actaris Medium & High Pressure
Badged Capacity: 800 16000 ft3/hr
Max Operating Pressure: 275 1440 PSIG
Readout: Mechanical FT3 & M3
Connections: 2”- 4” ANSI 300 / 600 FL
Install: Inside or Outside
Lead time: 6-8 weeks
Delta MP Bulletin
Delta HP Bulletin
Delta Install Instructions |
Remanufactured (Dresser, Schlumberger)
Badged Capacity: 800 102000 ft3/hr
Max Operating Pressure: 125 175 PSIG
Readout: Mechanical FT3 & M3
Connections: 2”- 10” ANSI 150 FL
Install: Inside or Outside
Lead Time: 3-5 days
Remanufacturing Service
Dresser Remanufactured LMMA
Actaris Remanufactured Delta |
| These meters are ideal for billing quality submetering, EPA emissions reporting requirements or for meeting monitoring & billing requirements of U.S. federal facilities as defined in 10 CFR 435, Section 10; Executive Order 12902 (Energy policy Act of 1992); Defense Energy Program Policy Memorandum 92-2; and Dept. of the Air Force, Engineering Technical Letter ETL 94-2. |